Final Year Project (Mock Assessment)
IT’S OVER.
Actually it was over last week. It was quite brutal. At first I thought it’d be this week that we have the final assessment, but suddenly on Tuesday, I received a call saying the mock presentation has been changed to the next day, which means Wednesday. WTF!
Not only I still had some shots to be reshot, it also meant that I had to reshoot, edit + export the video and finish production report and proposal all in less than 24 hours. It was madness. Pure madness. I had to rush everything, multitasking on pc and laptop at the same time editing and doing my proposal. I didn’t even sleep. I finally finished everything at 1 pm, but I accidentally fell asleep for half an hour which made me quite late.. so at 2 pm I rushed to get my stuff printed. Now you see, there’s one print shop at cova squre which is the opposite of my college, and usually I would go to a shop at Sunway Damansara to print.. but I thought why not that day since I was late, I’d got to the one opposite my college.
What a retarded idea.
Not only the person messed up the printing, they were slow as hell.. the woman didn’t even know how to fucking bind stuff.. and actually made the binding holes on the RIGHT side instead of the LEFT side.. WTF! Who flips a proposal open that way?? Unless if you’re in Japan where you read everything from right to left but not MALAYSIA. Even had the nerve to suggest to cut the side? Wtf, the paper will become smaller. They didn’t even check what needs color printing… and the color printing was blurry and it sucks.
So I told them to redo every little retarded mistakes they did.. and I don’t know how much cost they burned lol So what was supposed to take 15 minutes and less turned out to be 1 hour. So when I went there, I had to wait until almost 5 pm for my turn.. and guess what? ALL of our projects got rejected! ARGH. Mine didn’t get rejected THAT much compared to graphic design but they’re still time consuming.. and at least they have 4 days to fix them.. I had less than 24 hours until the FINAL! So 3 days of no sleep.
I’ll blog again about my final project assessment later.
HAPPY EID ADHA! SELAMAT HARI RAYA AIDILADHA! and HAPPY THANKSGIVING!
barcode scanner <3!
Name's 
holy snap, how can you work sleepless during EID.
good lucks.